The project will consist of 200 wind turbines, each with a capacity of 4 megawatts (mw). each turbine costs
$1.2 million to build. electrical demand in the area to be served by the project is expected to be 2.0 x 100 mwh
per year.
(d) calculate how much electricity (in mwh) the wind project needs to generate per year in order to provide
80% of the annual electrical demand in the service area. show all work.
(e) customers in the service area pay $0.20/kwh for electricity. calculate how much revenue will be produced
if the wind turbines provide 80% of the annual electrical demand in the service area. show all work.
(f) assuming all turbines are operating, calculate how many hours the wind turbines must operate to provide
80% of the annual electrical demand in the service area. show all work.

ansver
Answers: 3

Another question on Advanced Placement (AP)

question
Advanced Placement (AP), 23.06.2019 12:20
Write in detail! will give free points 30 + free ! looking at the red mustang on the left, and the blue prius on the right, explain which vehicle should be given right-of-way at this intersection.
Answers: 1
question
Advanced Placement (AP), 25.06.2019 03:30
Why is the road most slick when it first begins to rain? a. oils the road has absorbed begin to float. b. the water has not had time to run off. c. a higher concentration of dirt makes the road more slick. d. none of the above
Answers: 1
question
Advanced Placement (AP), 25.06.2019 16:30
This is about this site if you answer enough questions can you get real money or not
Answers: 2
question
Advanced Placement (AP), 26.06.2019 07:30
What type of commercial speech is not protected by the 1st amendment?
Answers: 1
You know the right answer?
The project will consist of 200 wind turbines, each with a capacity of 4 megawatts (mw). each turbin...
Questions
Questions on the website: 13722359