subject
Business, 25.06.2019 11:30 marquez8

Which of the following statements regarding pert times is true? (a) the optimistic time estimate is an estimate of the minimum time an activity will require. (b) the optimistic time estimate is an estimate of the maximum time an activity will require. (c) the probable time estimate is calculated as t = (a + 4m + b). (d) pessimistic time estimate is an estimate of the minimum time an activity will require. (e) most likely time estimate is an estimate of the maximum time an activity will require.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 03:00
If you were running a company, what are at least two things you could do to improve its productivity.
Answers: 1
question
Business, 22.06.2019 18:10
Why would an investor invest in your stocks
Answers: 1
question
Business, 22.06.2019 19:00
In 1975, mcdonald’s introduced its egg mcmuffin breakfast sandwich, which remains popular and profitable today. this longevity illustrates the idea of:
Answers: 1
question
Business, 22.06.2019 19:40
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 100,000 fixed manufacturing overhead cost $ 650,000 variable manufacturing overhead cost per machine-hour $ 3.00 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 450 direct labor cost $ 210 machine-hours used 40
Answers: 3
You know the right answer?
Which of the following statements regarding pert times is true? (a) the optimistic time estimate is...
Questions
question
Mathematics, 01.11.2019 02:31
question
Mathematics, 01.11.2019 02:31
Questions on the website: 13722367