subject
Business, 14.07.2019 01:10 nurikchan

The project approach incorporates which of the following ideas?

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 21:40
Tandard product costs deerfield company manufactures product m in its factory. production of m requires 2 pounds of material p, costing $4 per pound and 0.5 hour of direct labor costing, $10 per hour. the variable overhead rate is $8 per direct labor hour, and the fixed overhead rate is $12 per direct labor hour. what is the standard product cost for product m? direct material answer direct labor answer variable overhead answer fixed overhead answer standard product cost per unit answer
Answers: 1
question
Business, 22.06.2019 02:30
Luc do purchased stocks for $6,000. he paid $4,000 in cash and borrowed $2,000 from the brokerage firm. he bought 100 shares at $60.00 per share ($6,000 total). the loan has an annual interest rate of 8 percent. six months later, luc do sold the stock for $65 per share. he paid a commission of $120 and repaid the loan. his net profit was how much? pls
Answers: 3
question
Business, 22.06.2019 07:20
Richardson hired j.c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j.c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
question
Business, 22.06.2019 07:50
In december of 2004, the company you own entered into a 20-year contract with a grain supplier for daily deliveries of grain to its hot dog bun manufacturing facility. the contract called for "10,000 pounds of grain" to be delivered to the facility at the price of $100,000 per day. until february 2017, the supplier provided processed grain which could easily be used in your manufacturing process. however, no longer wanting to absorb the cost of having the grain processed, the supplier began delivering whole grain. the supplier is arguing that the contract does not specify the type of grain that would be supplied and that it has not breached the contract. your company is arguing that the supplier has an onsite processing plant and processed grain was implicit to the terms of the contract. over the remaining term of the contract, reshipping and having the grain processed would cost your company approximately $10,000,000, opposed to a cost of around $1,000,000 to the supplier. after speaking with in-house counsel, it was estimated that litigation would cost the company several million dollars and last for years. weighing the costs of litigation, along with possible ambiguity in the contract, what are three options you could take to resolve the dispute? which would be the best option for your business and why?
Answers: 2
You know the right answer?
The project approach incorporates which of the following ideas?...
Questions
question
Mathematics, 08.01.2021 19:50
question
Mathematics, 08.01.2021 19:50
Questions on the website: 13722362