subject
Business, 17.09.2019 21:20 Triciamorrison

Draw an erd for the following user requirements. each computer manufactured in dell inc. has a unique serial number, cpu speed, memorysize, price, and dvd speed. each computer must belong to one warranty policy type, while eachwarranty policy type covers many computers. every computer has to have a warranty, while we mayhave some warranty policy types not covering any computer at all. for each warranty policy type, we want to record its unique policy id, name, and the length of coverage. computers are assembledby assembly workers. we want to keep the following information about assembly line workers: name (including first and last name), a unique eid, phone number (s), and birth date. one workercan assemble many computers, and one computer can be assembled by many workers together. acomputer has to be assembled by at least a worker, and a worker has to assemble at least onecomputer. for the assembling activity, we need to record how many hours each worker spent oneach computer.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 19:50
Statistical process control charts: a. indicate to the operator the true quality of material leaving the process. b. display upper and lower limits for process variables or attributes and signal when a process is no longer in control. c. indicate to the process operator the average outgoing quality of each lot. d. display the measurements on every item being produced. e. are a graphic way of classifying problems by their level of importance, often referred to as the 80-20 rule.
Answers: 2
question
Business, 22.06.2019 21:00
At present, the united states has an embargo against north korea because a. the two countries have extremely poor political relations. b. north korea will not adopt a capitalist government. c. north korean products are too difficult to use. d. north korea has an embargo on american products. e. products from north korea are in higher demand than american-made products.
Answers: 2
question
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
question
Business, 22.06.2019 22:00
Retail industry fundamentals credential exam,part 1 all answers
Answers: 3
You know the right answer?
Draw an erd for the following user requirements. each computer manufactured in dell inc. has a uniqu...
Questions
Questions on the website: 13722361