As vp for operations at méndez-pinero engineering, you must decide which product design, a or b, has the higher reliability. b is designed with backup units for components upper r 3 and upper r 4. product design a upper r 1=0.97 upper r 2=0.92 upper r 3=0.997 upper r 4=0.991 right arrow product design b 0.97 0.92 0.981 0.97 right arrow | | 0.94 0.97 upper r 1 upper r 2 upper r 3 upper r 4 the overall reliability of the system provided in design a = nothing% (enter your response as a percentage rounded to two decimal places).

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 13:10
A4-year project has an annual operating cash flow of $59,000. at the beginning of the project, $5,000 in net working capital was required, which will be recovered at the end of the project. the firm also spent $23,900 on equipment to start the project. this equipment will have a book value of $5,260 at the end of the project, but can be sold for $6,120. the tax rate is 35 percent. what is the year 4 cash flow?
Answers: 2
question
Business, 22.06.2019 23:20
Assume a competitive firm faces a market price of $60, a cost curve of c = 0.003q^3 + 25q + 750, and a marginal cost of curve of: mc = 0.009q^2 + 25.the firm's profit maximizing output level (to the nearest tenth) is , and the profit (to the nearest penny) at this output level is $ will cause the market supply to (shift right/shift left). this will continue until the price is equal to the minimum average cost of $
Answers: 2
question
Business, 23.06.2019 00:10
Mno corporation uses a job-order costing system with a predetermined overhead rate based on direct labor-hours. the company based its predetermined overhead rate for the current year on the following data: total estimated direct labor-hours 50,000 total estimated fixed manufacturing overhead cost $ 285,000 estimated variable manufacturing overhead per direct labor-hour $ 3.80 recently, job p123 was completed with the following characteristics: total actual direct labor-hours 20 direct materials $ 710 direct labor cost $ 500 the amount of overhead applied to job p123 is closest to:
Answers: 2
question
Business, 23.06.2019 00:30
You have been solicited to conduct a performance evaluation for a public organization that has been corrupted over issues of personnel embezzling funds. before actually conducting the evaluation, you—the evaluator—need to know certain specifics to conduct a thorough evaluation. compose a proposal that describes what type of evaluation will be conducted. in the proposal, explain the type of public organization. describe some of the main services, products, and activities the organization provides to the public. describe the size of the problem, who is affected by the problem, how long the problem has been in existence, and how long the evaluation will take. also, describe what the evaluation will assess with respect to organizational leadership. finally, what outcomes do you propose the evaluation will to achieve for the organization?
Answers: 2
You know the right answer?
As vp for operations at méndez-pinero engineering, you must decide which product design, a or b, has...
Questions
question
Health, 17.11.2020 14:00
question
Mathematics, 17.11.2020 14:00
question
Mathematics, 17.11.2020 14:00
question
Geography, 17.11.2020 14:00
question
Mathematics, 17.11.2020 14:00
Questions on the website: 13722361