subject
Business, 30.10.2019 01:31 jhenifelix

Multiple jobs can run in parallel and finish faster than if they had run sequentially. suppose that two jobs, each needing 20 minutes of cpu time, start simultaneously. how long will the last one take to complete if they run sequentially? how long if they run in parallel? assume 50% i/o wait.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 18:30
Which of these is an example of innovation?
Answers: 2
question
Business, 22.06.2019 20:30
Afirm wants to hire a project manager (pm) at a salary of $100,000. 30% of pms have high ability, and 70% of pms have low ability. high ability pms generate $120,000 in revenue and low ability pms generate $80,000 in revenue. in addition to differences in productivity, high and low ability pms have different outside offers. if a high ability pm is not hired by the firm, she can work for another company at a salary of $80,000. if the low ability pm is not hired by the firm, she can work for another company for $70,000. high ability pms are also able to get a project management professional (pmp) certification at a cost of $1,000. low ability pms are unable to get a pmp certification (they would fail the test). the firm is not able to observe a pm’s ability, but is able to observe and verify whether or not the pm has a pmp certificate.(a) draw the extensive form of the game.expert answer
Answers: 3
question
Business, 22.06.2019 21:20
Which of the following best explains how trade enables greater specialization among producers? a. trade diversifies the market by bringing specialized goods from around the world. b. trade requires distribution networks and adds one more step to the production process. c. trade enables producers to open up new markets for their goods and services. d. trade allows people to focus on one kind of production and trade for their other needs.
Answers: 1
question
Business, 22.06.2019 21:50
Q3. loral corporation manufactures parts for an aircraft company. it uses a computerized numerical controlled (cnc) machining center to produce a specific part that has a design (nominal) target of 1.275 inches with tolerances of ± 0.020 inch. the cnc process that manufactures these parts has a mean of 1.285 inches and a standard deviation of 0.005 inch. compute the process capability ratio and process capability index, and comment on the overall capability of the process to meet the design specifications.
Answers: 1
You know the right answer?
Multiple jobs can run in parallel and finish faster than if they had run sequentially. suppose that...
Questions
Questions on the website: 13722361