Aconstruction project has been tasked with building a four-lane road from a remote mountain fortress to a major expressway lying at the base of the mountain. the slope leading to the mountain fortress is so precipitous that the only conceivable way to carry out the project is by building the road downhill, since construction equipment is able to move down, but not up, the steep terrain. the foreman has devised the following solution: dismantle each construction vehicle and tie a part upon the back of a donkey, an animal capable of making the steep ascent. the foreman has at his disposal more than 100 donkeys, each of which is capable of making multiple trips up the mountain.
in order for the foreman’s plan to be successful, which of the following pieces of information is most important?
a) whether the strongest donkey is able to transport the heaviest piece of equipment
b) whether the weakest donkey is able to transport the lightest piece of equipment
c) whether any donkey is capable of transporting multiple parts
d) whether the second strongest donkey is able to transport the heaviest piece of equipment
e) whether the weakest donkey is able to transport the heaviest piece of equipment

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 20:30
According to the law of demand, there is an inverse relationship between price and quantity demanded. that is, the demand curve for goods and services slopes downward. why?
Answers: 3
question
Business, 22.06.2019 11:30
Leon and sara are arguing over when the best time is to degrease soup. leon says that it's easiest to degrease soup when it's boiling. sara says it's easiest to degrease soup when it's cold. who is correct? a. neither leon nor sara is correct. b. leon is correct. c. both leon and sara are correct. d. sara is correct. student b   incorrect which following answer correct?
Answers: 1
question
Business, 22.06.2019 15:00
Oerstman, inc. uses a standard costing system and develops its overhead rates from the current annual budget.the budget is based on an expected annual output of 120,000 units requiring 480,000 direct labor hours.(practical capacity is 500,000 hours)annual budgeted overhead costs total $772,800, of which $556,800 is fixed overhead.a total of 119,300 units, using 478,000 direct labor hours, were produced during the year.actual variable overhead costs for the year were $260,400 and actual fixed overhead costs were $555,450.required: 1. compute the fixed overhead spending variance and indicate if favorable or unfavorable.2. compute the fixed overhead volume variance and indicate if favorable or unfavorable.
Answers: 3
question
Business, 22.06.2019 19:10
Do it! review 16-3 the assembly department for right pens has the following production data for the current month. beginning work in process units transferred out ending work in process 0 22,500 16,000 materials are entered at the beginning of the process. the ending work in process units are 70% complete as to conversion costs. compute the equivalent units of production for (a) materials and (b) conversion costs. materials conversion costs the equivalent units of production
Answers: 2
You know the right answer?
Aconstruction project has been tasked with building a four-lane road from a remote mountain fortress...
Questions
question
Mathematics, 14.04.2020 18:49
question
Mathematics, 14.04.2020 18:49
question
English, 14.04.2020 18:50
Questions on the website: 13722367