subject
Business, 30.11.2019 01:31 xem74

Tsunamis travel through the ocean at very fast speeds, but sometimes they can take hours to reach a coastline because they have to travel great distances. this means that government agencies sometimes have enough time to warn their citizenry of a coming tsunami and conduct an evacuation. look at the map below, and rank the time it would take a tsunami to reach honolulu from the given sources.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 10:30
True or false: a fitted model with more predictors will necessarily have a lower training set error than a model with fewer predictors.
Answers: 2
question
Business, 22.06.2019 18:00
Carlton industries is considering a new project that they plan to price at $74.00 per unit. the variable costs are estimated at $39.22 per unit and total fixed costs are estimated at $12,085. the initial investment required is $8,000 and the project has an estimated life of 4 years. the firm requires a return of 8 percent. ignore the effect of taxes. what is the degree of operating leverage at the financial break-even level of output?
Answers: 3
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
question
Business, 22.06.2019 20:00
Afirm is producing at minimum average total cost with its current plant. draw the firm's long-run average cost curve. label it. draw a point on the lrac curve at which the firm cannot lower its average total cost. draw the firm's short-run average total cost curve that is consistent with the point you have drawn. label it.g
Answers: 2
You know the right answer?
Tsunamis travel through the ocean at very fast speeds, but sometimes they can take hours to reach a...
Questions
question
Social Studies, 17.05.2021 16:20
question
Physics, 17.05.2021 16:20
question
Mathematics, 17.05.2021 16:20
question
Mathematics, 17.05.2021 16:20
question
Physics, 17.05.2021 16:20
question
Mathematics, 17.05.2021 16:20
Questions on the website: 13722360