Suppose the bandwidth on a point-to-point link to moon is 2 Mbps and the one-way propagation delay is 1 second. Assume that size of each packet is 125 bytes. Assume that window-size can be adjusted to achieve the maximum transmission rate. Answer the following for each ARQ scheme: stop-and- wait, go-back-n and selective-repeat

(a) (9 pt.) Assuming that the link is error-free, what is maximum rate of transmission achievable from earth to moon? (Assume zero queuing delay, and assume zero transmission time for ACK packets).

(b) (3 pt.) Assuming that the link is error-free, to keep the pipe full for efficiency, what should be the window size that will allow go-back-n and selective repeat to achieve the maximum rate of transmission in part (a)?

(c) (9 pt.) What is the minimum number of bits you need for the sequence number to achieve the above maximum rate of transmission.

(d) (9 pt.) Suppose that we are continuously transmitting packets from earth to moon and the 4 packet is lost and no other packets or ACKs are lost. How many and which packets get retransmitted?

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 02:30
The dollar value generated over decades of customer loyalty to your company is known as brand equity. viability. sustainability. luck.
Answers: 1
question
Business, 22.06.2019 05:30
The hartman family is saving $400 monthly for ronald's college education. the family anticipates they will need to contribute $20,000 towards his first year of college, which is in 4 years .which best explain s whether the family will have enough money in 4 years ?
Answers: 1
question
Business, 22.06.2019 05:50
Emily spent her summer vacation in buenos aires, argentina, where she got plastic surgery for a fraction of what it would cost in the united states. this is an example of:
Answers: 2
question
Business, 22.06.2019 08:50
Dyed-denim corporation is seeking to lower the costs of value creation and achieve a low-cost position. as a result, it plans to move its manufacturing plant from the u.s. to thailand, which based on company research, is the optimal location for production. this strategic move will most likely allow the company to realize
Answers: 3
You know the right answer?
Suppose the bandwidth on a point-to-point link to moon is 2 Mbps and the one-way propagation delay i...
Questions
question
Social Studies, 07.07.2019 05:30
Questions on the website: 13722367