Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z:

Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity
Machining Machine-hours $249,600 12,000 MHs
Machine setups Number of setups $162,400 280 setups
Production design Number of products $92,000 2 products
General factory Direct labor-hours $309,600 14,400 DLHs

Activity Measure Product Y Product Z
Machine-hours 7,800 4,200
Number of setups 40 240
Number of products 1 1
Direct labor-hours 8,800 5,600

Required:
a. What is the activity rate for the Product Design activity cost pool?
b. What is the activity rate for the General Factory activity cost pool?
c. Which of the four activities is a batch-level activity?

i. Machine setups activity
ii. General factory activity
iii. Machining activity
iv. Product design activity

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 00:00
If his parents cannot alex with college, and two of his scholarships will be awarded to other students if he does not accept them immediately, which is the best option for him?
Answers: 1
question
Business, 22.06.2019 00:00
Choose the list of the best uses for word processing software. lists, resumes, writing a book, and payroll data letters to your friends, resumes, spreadsheets, and school papers resumes, cover letters, databases, and crossword puzzles book reports, letters to your friends, resumes, and contracts
Answers: 2
question
Business, 22.06.2019 11:30
10.     lucy is catering an important luncheon and wants to make sure her bisque has the perfect consistency. for her bisque to turn out right, it should have the consistency of a. cold heavy cream. b. warm milk. c. foie gras. d. thick oatmeal. student d   incorrect
Answers: 2
question
Business, 22.06.2019 19:00
What is an equation of the line in slope intercept formm = 4 and the y-intercept is (0,5)y = 4x-5y = -5x +4y = 4x + 5y = 5x +4
Answers: 1
You know the right answer?
Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. Th...
Questions
question
Physics, 17.12.2020 20:00
question
Mathematics, 17.12.2020 20:00
question
English, 17.12.2020 20:00
question
English, 17.12.2020 20:00
Questions on the website: 13722367