subject
Business, 12.03.2020 22:04 lexijo122

Determine the utilization and the efficiency for each of these situations: A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 10 loans per day and an effective capacity of 8 loans per day. A furnace repair team that services an average of four furnaces a day if the design capacity is six furnaces a day and the effective capacity is five furnaces a day.

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:40
Tandard product costs deerfield company manufactures product m in its factory. production of m requires 2 pounds of material p, costing $4 per pound and 0.5 hour of direct labor costing, $10 per hour. the variable overhead rate is $8 per direct labor hour, and the fixed overhead rate is $12 per direct labor hour. what is the standard product cost for product m? direct material answer direct labor answer variable overhead answer fixed overhead answer standard product cost per unit answer
Answers: 1
question
Business, 22.06.2019 11:00
Using a cps-sample of 7,440 individuals, you estimate the following regression: = 20.91 - 2.61 x female where female is a binary variable that takes on the value of 1 for females and is 0 otherwise. the standard error on the coefficient on female is 0.25. the 95% confidence interval for the gender wage gap, or the amount that females earn less, is: a) [-3.10, -2.12] b) [18.30, 23.52] c) [-3.02, -2.20] d) [-1.96, -1.64]
Answers: 3
question
Business, 22.06.2019 19:10
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e.g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any “start of day” or “end of day” effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
question
Business, 23.06.2019 00:50
Aproduction department's output for the most recent month consisted of 8,000 units completed and transferred to the next stage of production and 5,000 units in ending work in process inventory. the units in ending work in process inventory were 50% complete with respect to both direct materials and conversion costs. calculate the equivalent units of production for the month, assuming the company uses the weighted average method.
Answers: 3
You know the right answer?
Determine the utilization and the efficiency for each of these situations: A loan processing operati...
Questions
question
Biology, 13.04.2021 16:20
Questions on the website: 13722367