subject
Business, 20.03.2020 02:58 25linm

Swan, Inc. uses the high-low method to analyze cost behavior. The company observed that at 20,000 machine hours of activity, total maintenance costs averaged $37.30 per hour. When activity jumped to 25,000 machine hours, which was still within the relevant range, the average total cost per machine hour was $31.30.

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 16:10
Braverman company has two manufacturing departments—finishing and fabrication. the predetermined overhead rates in finishing and fabrication are $18.00 per direct labor-hour and 110% of direct materials cost, respectively. the company’s direct labor wage rate is $16.00 per hour. the following information pertains to job 700: finishing fabrication direct materials $ 410 $ 60 direct labor $ 128 $ 48 required: 1. what is the total manufacturing cost assigned to job 700? 2. if job 700 consists of 15 units, what is the unit product cost for this job?
Answers: 1
question
Business, 21.06.2019 16:30
Which economic system could be characterized by the "iron fist", meaning a central authority figure has control over most of the economy? market economy command economy traditional economy free enterprise economy
Answers: 3
question
Business, 22.06.2019 15:30
Uknow what i love about i ask a dumb question it is immediately answered but when i ask a real question it take like an hour to get answered
Answers: 2
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
Swan, Inc. uses the high-low method to analyze cost behavior. The company observed that at 20,000 ma...
Questions
question
Chemistry, 22.11.2019 18:31
question
Mathematics, 22.11.2019 18:31
Questions on the website: 13722367