subject
Business, 03.04.2020 02:15 dsreilly826

Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct labor-hours and its standard cost card per unit is as follows: Direct materials: 5 pounds at $10 per pound $ 50 Direct labor: 3 hours at $17 per hour 51 Variable overhead: 3 hours at $7 per hour 21 Total standard cost per unit $ 122 The planning budget for March was based on producing and selling 24,000 units. However, during March the company actually produced and sold 30,600 units and incurred the following costs: a. Purchased 170,000 pounds of raw materials at a cost of $9.00 per pound. All of this material was used in production. b. Direct laborers worked 68,000 hours at a rate of $18 per hour. c. Total variable manufacturing overhead for the month was $512,0401. What raw materials cost would be included in the company’s flexible budget for March?2. What is the materials price variance for March? (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i. e., zero variance.).)3. What is the materials quantity variance for March? (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i. e., zero variance.).)4. If Preble had purchased 183,000 pounds of materials at $9.00 per pound and used 170,000 pounds in production, what would be the materials price variance for March? (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i. e., zero variance.). Do not round intermediate calculations.)5. If Preble had purchased 183,000 pounds of materials at $9.00 per pound and used 170,000 pounds in production, what would be the materials quantity variance for March? (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i. e., zero variance.). Do not round intermediate calculations.)6. What direct labor cost would be included in the company’s planning budget for March?7. What direct labor cost would be included in the company’s flexible budget for March?8. What is the labor rate variance for March? (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i. e., zero variance.). Do not round intermediate calculations.)9. What is the labor efficiency variance for March? (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i. e., zero variance.). Do not round intermediate calculations.)10. What is the labor spending variance for March? (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i. e., zero variance.). Do not round intermediate calculations.)11. What variable manufacturing overhead cost would be included in the company’s planning budget for March?12. What variable manufacturing overhead cost would be included in the company’s flexible budget for March?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 01:50
Which value describes the desire to be one’s own boss? a. autonomy b. status c. security d. entrepreneurship
Answers: 2
question
Business, 22.06.2019 07:30
Jewelry manufacturers produce a range of products such as rings, necklaces, bracelets, and brooches. what fundamental economic question are they addressing by offering this range of items?
Answers: 3
question
Business, 22.06.2019 07:40
Myflvs -question 3 multiple choice worth 2 points)(10.04 hc)in panama city in january, high tide was at midnight. the water level at high tide was 9 feet and1 foot at low tide. assuming the next high tide is exactly 12 hours later and that the height of thewater can be modeled by a cosine curve, find an equation for water level in january for panamacity as a function of time (t).of(t) = 4 + 5of(t) = 5 cost + 4o 460) = 5 cos 1+ 4of(0) = 4 cos + 5
Answers: 1
question
Business, 22.06.2019 12:50
Performance bicycle company makes steel and titanium handle bars for bicycles. it requires approximately 1 hour of labor to make one handle bar of either type. during the most recent accounting period, barr company made 7,700 steel bars and 2,300 titanium bars. setup costs amounted to $35,000. one batch of each type of bar was run each month. if a single company-wide overhead rate based on direct labor hours is used to allocate overhead costs to the two products, the amount of setup cost assigned to the steel bars will be:
Answers: 2
You know the right answer?
Preble Company manufactures one product. Its variable manufacturing overhead is applied to productio...
Questions
question
Mathematics, 18.10.2019 14:00
question
Mathematics, 18.10.2019 14:00
Questions on the website: 13722360