subject
Business, 04.04.2020 05:07 mewings

An asset (not an automobile) placed in service in June 2019 has a depreciable basis of $2,555,000, a recovery period of 5 years, and is the only asset placed in service during the year. Assuming bonus depreciation is not used, a half-year convention, and the expensing election is made for the maximum eligible amount, what is the amount of cost that can be deducted in 2019 assuming the business earned taxable income of $1,000,000 before deducting any cost recovery on the asset? a. $1,407,000 b. $407,000 c. $2,000,000 d. $500,000 e. $1,000,000

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 19:40
Anew equipment has been proposed by engineers to increase the productivity of a certain manual welding operation. the investment cost is $25,000, and the equipment will have a market value of $5,000 at the end of a study period of five years. increased productivity attributable to the equipment will amount to $10,000 per year after operating costs have been subtracted from the revenue generated by the additional production. if marr is 10%, is investing in this equipment feasible? use annual worth method.
Answers: 3
question
Business, 22.06.2019 20:20
You are the cfo of a u.s. firm whose wholly owned subsidiary in mexico manufactures component parts for your u.s. assembly operations. the subsidiary has been financed by bank borrowings in the united states. one of your analysts told you that the mexican peso is expected to depreciate by 30 percent against the dollar on the foreign exchange markets over the next year. what actions, if any, should you take
Answers: 2
question
Business, 22.06.2019 20:20
Direct materials (4.2 x $15) $ 63direct labor ($12 x 17.5) $210manufacturing overhead ($2.40 x 17.5) $42total job cost $ 315dougan, inc. allocates overhead based on a predetermined overhead rate of $2.40 per direct labor hour. employees are paid $12.00 per hour. job 24 requires 4.2 pounds of direct materials at a cost of $15.00 per pound. employees worked a total of 17.5 hours to complete the job. actual manufacturing overhead costs totaled $80,000 for the year for the company. how much is the cost of job 24?
Answers: 1
question
Business, 22.06.2019 20:30
John and daphne are saving for their daughter ellen's college education. ellen just turned 10 at (t = 0), and she will be entering college 8 years from now (at t = 8). college tuition and expenses at state u. are currently $14,500 a year, but they are expected to increase at a rate of 3.5% a year. ellen should graduate in 4 years--if she takes longer or wants to go to graduate school, she will be on her own. tuition and other costs will be due at the beginning of each school year (at t = 8, 9, 10, and 11).so far, john and daphne have accumulated $15,000 in their college savings account (at t = 0). their long-run financial plan is to add an additional $5,000 in each of the next 4 years (at t = 1, 2, 3, and 4). then they plan to make 3 equal annual contributions in each of the following years, t = 5, 6, and 7. they expect their investment account to earn 9%. how large must the annual payments at t = 5, 6, and 7 be to cover ellen's anticipated college costs? a. $1,965.21b. $2,068.64c. $2,177.51d. $2,292.12e. $2,412.76
Answers: 1
You know the right answer?
An asset (not an automobile) placed in service in June 2019 has a depreciable basis of $2,555,000, a...
Questions
question
Social Studies, 11.10.2020 07:01
question
Mathematics, 11.10.2020 07:01
question
Social Studies, 11.10.2020 07:01
question
Mathematics, 11.10.2020 07:01
question
Mathematics, 11.10.2020 07:01
Questions on the website: 13722360