subject
Business, 15.04.2020 03:12 suzieuzie

The actual cost of direct materials is $10.50 per pound. The standard cost per pound is $10.25. During the current period, 9,100 pounds of direct materials were used in production and 17,500 pounds were purchased. The standard quantity of direct materials for actual units produced is 17,300 pounds. How much is the direct materials quantity variance?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 07:30
An important application of regression analysis in accounting is in the estimation of cost. by collecting data on volume and cost and using the least squares method to develop an estimated regression equation relating volume and cost, an accountant can estimate the cost associated with a particular manufacturing volume. consider the following sample of production volumes and total cost data for a manufacturing operation. production volume (units) total cost ($) 400 4000 450 5000 550 5400 600 5900 700 6400 750 7000 compute b 1 and b 0 (to 2 decimals if necessary). b 1 b 0 complete the estimated regression equation (to 2 decimals if necessary). = + x what is the variable cost per unit produced (to 1 decimal)? $ compute the coefficient of determination (to 4 decimals). note: report r 2 between 0 and 1. r 2 = what percentage of the variation in total cost can be explained by the production volume (to 2 decimals)? % the company's production schedule shows 500 units must be produced next month. what is the estimated total cost for this operation (to 2 decimals)? $
Answers: 1
question
Business, 22.06.2019 11:40
Vendors provide restaurants with what? o a. cooked items ob. raw materials oc. furniture od. menu recipes
Answers: 1
question
Business, 22.06.2019 12:50
Suppose the real risk-free rate and inflation rate are expected to remain at their current levels throughout the foreseeable future. consider all factors that affect the yield curve. then identify which of the following shapes that the u.s. treasury yield curve can take. check all that apply.
Answers: 2
question
Business, 22.06.2019 20:30
Afirm wants to hire a project manager (pm) at a salary of $100,000. 30% of pms have high ability, and 70% of pms have low ability. high ability pms generate $120,000 in revenue and low ability pms generate $80,000 in revenue. in addition to differences in productivity, high and low ability pms have different outside offers. if a high ability pm is not hired by the firm, she can work for another company at a salary of $80,000. if the low ability pm is not hired by the firm, she can work for another company for $70,000. high ability pms are also able to get a project management professional (pmp) certification at a cost of $1,000. low ability pms are unable to get a pmp certification (they would fail the test). the firm is not able to observe a pm’s ability, but is able to observe and verify whether or not the pm has a pmp certificate.(a) draw the extensive form of the game.expert answer
Answers: 3
You know the right answer?
The actual cost of direct materials is $10.50 per pound. The standard cost per pound is $10.25. Duri...
Questions
question
Mathematics, 15.04.2020 23:53
question
Mathematics, 15.04.2020 23:53
Questions on the website: 13722361