Business, 21.04.2020 20:06 hsjsjsjdjjd
For an attributes sampling plan, the tolerable deviation rate is 4%, the computed upper deviation rate is 7%, the sample deviation rate is 3%, and the risk of assessing control risk toolow is 5%. Which of the following is true? A. The auditor must increase control risk because the risk of assessing control risk too low is greater than the tolerable deviation rateB. The auditor is likely to increase control risk because the risk of assessing control risk too low is greater than the tolerable deviation rateC. The auditor must increase control risk because the computed upper deviation rate is greaterthan the tolerable deviation rateD. The auditor is likely to increase control risk because the computed upper deviation rate is greater than the tolerable deviation rate
Answers: 3
Business, 22.06.2019 05:30
From a business perspective, an information system provides a solution to a problem or challenge facing a firm and represents a combination of management, organization, and technology elements. the organization's hierarchy, functional specialties, business processes, culture, and political interest groups are components of which element of information systems?
Answers: 1
Business, 22.06.2019 10:00
Carrie works at a canned food production factory. the government wanted to give a boost to the salt industry, so it lined up numerous subsidies and tax exemptions for the sector. this lead to a decrease in production costs. this also meant that consumers could access canned foods at a lower price, which lead to an increase in demand for the product. which kind of economic system is carrie’s company dealing with? carrie’s company is dealing with a/an economy.
Answers: 2
Business, 23.06.2019 04:00
Management training programs, mentoring programs, and coaching systems are examples of
Answers: 1
Business, 23.06.2019 08:30
Ryan receives an e-mail that states the internet is being cleaned up and that he should leave his computer powered-off for 24 hours after receipt of this message. after careful review of the message contents and verifying the information with the desk he realizes this is:
Answers: 2
For an attributes sampling plan, the tolerable deviation rate is 4%, the computed upper deviation ra...
Mathematics, 31.05.2020 01:01
Mathematics, 31.05.2020 01:01
Mathematics, 31.05.2020 01:01
Mathematics, 31.05.2020 01:01
Social Studies, 31.05.2020 01:01
Chemistry, 31.05.2020 01:01