If Merilee Industries installs a lockbox system it should reduce its average collection time by 2.2 days at a cost of $.75 per check. On an average day, 594 checks with an average value of $4,618 each are received. The daily interest rate on Treasury bills is .009 percent. What is the net present value of this lockbox arrangement?

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 00:30
Aprice ceiling is “binding” if the price ceiling is set below the equilibrium price. suppose that the equilibrium price is $5. if a price ceiling is set at $6, this will not affect the market in any way since $5 remains a legally allowable price (since $5 < $6). a price ceiling of $6 is called a “non-binding” price ceiling. on the other hand, if the price ceiling is set at $4, the price ceiling is “binding” because the natural equilibrium price is $5 but that is no longer allowed. what happens when there is a binding price ceiling? at a price below the equilibrium price, quantity demanded exceeds quantity supplied. there is a shortage. normally, price increases eliminate shortages by increasing quantity supplied and decreasing quantity demanded. in this case, however, price increases are not allowed past the price ceiling. we therefore predict that the observed market price will be right at the price ceiling and there will be a permanent shortage. the observed quantity bought and sold will be dictated by the quantity supplied at the price ceiling. although consumers would like to buy more, there are no more units for sale
Answers: 1
question
Business, 22.06.2019 09:30
Any point on a country's production possibilities frontier represents a combination of two goods that an economy:
Answers: 3
question
Business, 22.06.2019 16:00
What is used by accountant to analyze transactions ?
Answers: 2
question
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
You know the right answer?
If Merilee Industries installs a lockbox system it should reduce its average collection time by 2.2...
Questions
question
Mathematics, 24.09.2019 04:30
question
Geography, 24.09.2019 04:30
question
Spanish, 24.09.2019 04:30
Questions on the website: 13722360