subject
Business, 06.05.2020 03:32 webbjalia04

Assume a U. S.-based MNC is borrowing Romanian leu (ROL) at an interest rate of 8% for one year. Also assume that the spot rate of the leu is $.00012 and the one-year forward rate of the leu is $.00010. The expected spot rate of the leu one-year from now is $.00011.What is the effective financing rate for the MNC assuming it borrows leu on an uncovered basis?

a) 10%
b) –10%
c) –1%
d) 1%
e)None of the above

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 18:40
Which of the following is most likely to lead to a general decrease in wages? a. elastic demand b. public goods c. an economic recovery d. immigration 2b2t
Answers: 1
question
Business, 21.06.2019 21:40
Tandard product costs deerfield company manufactures product m in its factory. production of m requires 2 pounds of material p, costing $4 per pound and 0.5 hour of direct labor costing, $10 per hour. the variable overhead rate is $8 per direct labor hour, and the fixed overhead rate is $12 per direct labor hour. what is the standard product cost for product m? direct material answer direct labor answer variable overhead answer fixed overhead answer standard product cost per unit answer
Answers: 1
question
Business, 22.06.2019 05:50
Nichols inc. manufactures remote controls. currently the company uses a plantminuswide rate for allocating manufacturing overhead. the plant manager is considering switchingminusover to abc costing system and has asked the accounting department to identify the primary production activities and their cost drivers which are as follows: activities cost driver allocation rate material handling number of parts $5 per part assembly labor hours $20 per hour inspection time at inspection station $10 per minute the current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $20 per labor hour. what are the indirect manufacturing costs per remote control assuming an method is used and a batch of 10 remote controls are produced? the batch requires 100 parts, 5 direct manufacturing labor hours, and 3 minutes of inspection time.
Answers: 2
question
Business, 22.06.2019 18:00
Match the different financial task to their corresponding financial life cycle phases
Answers: 3
You know the right answer?
Assume a U. S.-based MNC is borrowing Romanian leu (ROL) at an interest rate of 8% for one year. Als...
Questions
question
Biology, 11.12.2020 01:20
question
Health, 11.12.2020 01:20
question
History, 11.12.2020 01:20
Questions on the website: 13722360