Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records.

Production Activity Indirect Labor Indirect Materials Other Overhead
Grinding $ 360,000
Polishing $ 175,000
Product modification 400,000
Providing power $ 260,000
System calibration 550,000

Additional information on the drivers for its production activities follows.

Grinding 17,000 machine hours
Polishing 17,000 machine hours
Product modification 1,700 engineering hours
Providing power 17,000 direct labor hours
System calibration 250 batches
Job 3175 Job 4286
Number of units 120 units 1,500 units
Machine hours 300 MH 3,000 MH
Engineering hours 29 eng. hours 32 eng. hours
Batches 20 batches 60 batches
Direct labor hours 460 DLH 4,140 DLH
2, 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing activities into a single cost pool. Determine overhead costs to assign to the following jobs using ABC. What is the overhead cost per unit for Job 3175? What is the overhead cost per unit for Job 4286? (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "overhead assigned" to the nearest whole dollar.)

Job 3175 Job 4286
Activity Overhead Cost Activity Drivers Activity Rate Activity driver incurred Overhead assigned Activity driver incurred Overhead assigned
Grinding & Polishing $535,000 Machine hours
Product modification Engineering hrs.
Providing power Direct labor hrs.
System calibration batches
5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.)

Overhead costs 0
Direct labor hours
Product DL hours Plantwide OH rate Total Overhead Cost Units Produced OH Cost per unit
Job 3175 $0.00 $0
Job 4286 $0.00 $0

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 13:30
Boteck is a full-service technology company. it provides equipment, installation services, and training services. customers can purchase any product or service separately or as a bundled package. on may 3, box-rite corporation purchased computer equipment, installation, and training for a total cost of $120,000. estimated stand-alone fair values of the equipment, installation, and training are $75,000, $50,000, and $25,000 respectively. the journal entry to record the sale and installation on may 3 will include select one:
Answers: 1
question
Business, 22.06.2019 20:40
Owns a machine that can produce two specialized products. production time for product tlx is two units per hour and for product mtv is four units per hour. the machine’s capacity is 2,100 hours per year. both products are sold to a single customer who has agreed to buy all of the company’s output up to a maximum of 3,570 units of product tlx and 1,610 units of product mtv. selling prices and variable costs per unit to produce the products follow. product tlx product mtv selling price per unit $ 11.50 $ 6.90 variable costs per unit 3.45 4.14 determine the company's most profitable sales mix and the contribution margin that results from that sales mix.
Answers: 3
question
Business, 22.06.2019 21:00
You have $5,300 to deposit. regency bank offers 6 percent per year compounded monthly (.5 percent per month), while king bank offers 6 percent but will only compounded annually. how much will your investment be worth in 17 years at each bank
Answers: 3
question
Business, 23.06.2019 00:30
Activity-based costing (abc) is not truly a cost collection mechanism as much as it is an inventory valuation method. the main purpose for implementing an activity-based cost system is to try to overcome some of the cost distortions that occur in traditional costing from product differences when there are variations in size and complexity. however, one of the disadvantages of utilizing abc is that the additional information gathering necessary to implement costing with that level of detail might be beyond the reach of some companies with resource or financial constraints. with this in mind, what kinds of industries or companies do you think would benefit most from using activity-based costing and why? in designing or modifying an accounting system to capture appropriate costs for abc, what considerations do you think would need to be made?
Answers: 3
You know the right answer?
Craft Pro Machining produces machine tools for the construction industry. The following details abou...
Questions
question
Law, 09.12.2020 19:20
question
Mathematics, 09.12.2020 19:20
question
Chemistry, 09.12.2020 19:20
Questions on the website: 13722362