subject
Business, 17.06.2020 04:57 tmanpierce

Assume that x[n], n = 0, 1, · · · , 11 contains all non-zero samples of a complex-valued continuous-time signal xc(t) being sampled at t = n/100, and the bandwidth of xc(t) is less than 50Hz. Also assume that the 12-point DFT of x[n] is X[k] = [0, 1, 2, 3, 2, 1, 0, 0, 0, 0, 2, 1]. A) Determine and sketch 12 uniformly spaced samples of the continuous-time Fourier transform Xc(f) of zc(t) for –50Hz B) How do you compute 64 uniformly spaced samples of Xc(f) for –50Hz 5 f < 50Hz (starting from the above 12-point DFT sequence X[k])?

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 16:30
How is the architecture career pathway different from the construction pathway? a. architecture involves coordinating with contractors to make sure everyone stays on schedule. b. architecture involves using tools and equipment to build something new. c. architecture involves the design process, considering the function and safety of the project. d. architecture involves evaluating the work of contractors and employees.
Answers: 1
question
Business, 21.06.2019 21:30
Price and efficiency variances, journal entries. the schuyler corporation manufactures lamps. it has set up the following standards per finished unit for direct materials and direct manufacturing labor: direct materials: 10 lb. at $4.50 per lb. $45.00 direct manufacturing labor: 0.5 hour at $30 per hour 15.00 the number of finished units budgeted for january 2017 was 10,000; 9,850 units were actually produced. actual results in january 2017 were as follows: direct materials: 98,055 lb. used direct manufacturing labor: 4,900 hours $154,350 assume that there was no beginning inventory of either direct materials or finished units. during the month, materials purchased amounted to 100,000 lb., at a total cost of $465,000. input price variances are isolated upon purchase. input-efficiency variances are isolated at the time of usage. 1. compute the january 2017 price and efficiency variances of direct materials and direct manufacturing labor. 2. prepare journal entries to record the variances in requirement 1. 3. comment on the january 2017 price and efficiency variances of schuyler corporation. 4. why might schuyler calculate direct materials price variances and direct materials efficiency variances with reference to different points in time
Answers: 2
question
Business, 22.06.2019 05:00
Which of the following are considered needs? check all that apply
Answers: 1
question
Business, 22.06.2019 12:50
Two products, qi and vh, emerge from a joint process. product qi has been allocated $34,300 of the total joint costs of $55,000. a total of 2,900 units of product qi are produced from the joint process. product qi can be sold at the split-off point for $11 per unit, or it can be processed further for an additional total cost of $10,900 and then sold for $13 per unit. if product qi is processed further and sold, what would be the financial advantage (disadvantage) for the company compared with sale in its unprocessed form directly after the split-off point?
Answers: 2
You know the right answer?
Assume that x[n], n = 0, 1, · · · , 11 contains all non-zero samples of a complex-valued continuous-...
Questions
question
Mathematics, 08.10.2021 14:00
question
Mathematics, 08.10.2021 14:00
question
Mathematics, 08.10.2021 14:00
Questions on the website: 13722367