subject
Business, 04.11.2020 21:20 labrandonanderson00

I Need Help ASAP! Which of the following engineering drawing techniques shows the internal features of an object?
•Dimensioning
•Cross-hatching
•Shading
•Sectioning

Engineers use protractors and other drawing tools to create sketches.
•True
•False

Which of the following approaches to lean engineering consists of teams of people from different departments sharing information about a manufacturing process?
•Integrated product and process development (IPPD)
•Value stream mapping (VSM)
•Plan-do-study-act (PDSA)
•Design for manufacturing and assembly (DFMA)

Which of the following is NOT part of an A3 report?
•Plan
•Study
•Analysis
•Goal

Which of the following types of drawings includes a bill of materials (BOM)?
•Isometric drawing
•Orthographic drawing
•assembly drawing
•Design for manufacturing and assembly (DFMA)

Which of the following design for assembly and manufacturing principles is an engineer using when he or she designs a part that is small and easy to hold?
•Handling time
•Mistake proofing
•Part count reduction
•Lean assembly

Which tool helps lean engineers differentiate between value-added activities and nonvalue-added activities?
•Dimensioning
•Value stream map (VSM)
•Systems models
•Computer-aided drafting and design (CADD)

Who decides which equipment should be used in a manufacturing process?
•The operations manager
•The manufacturing engineer
•The equipment specialist
•The assembly line manager

The terms lean engineering and lean manufacturing are synonymous.
•True
•False

CADD has replaced the need for traditional drawing instruction in engineering courses.
•True
•False

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 16:10
(4 points) suppose the production function in the solow model is given by yt = ak¯ 3/4 t l 1/4 t . (a) what are the five equations and five unknowns that summarize the solow model? (b) show the transition dynamics in the solow model if ¯sy0 < ¯dk0. make sure you label the axes, curves, initial level of capital and steady-state level of capital. (c) solve for capital, output, capital per person, and output per person in the steady state. (d) if a¯ = 2, l¯ = 4, ¯s = 0.2, and ¯d = 0.05, calculate the steady-state level of capital and output per person.
Answers: 3
question
Business, 21.06.2019 20:20
Atoy manufacturer makes its own wind-up motors, which are then put into its toys. while the toy manufacturing process is continuous, the motors are intermittent flow. data on the manufacture of the motors appears below.annual demand (d) = 50,000 units daily subassembly production rate = 1,000setup cost (s) = $85 per batch daily subassembly usage rate = 200carrying cost = $.20 per unit per year(a) to minimize cost, how large should each batch of subassemblies be? (b) approximately how many days are required to produce a batch? (c) how long is a complete cycle? (d) what is the average inventory for this problem? (e) what is the total annual inventory cost (holding plus setup) of the optimal behavior in this problem?
Answers: 2
question
Business, 22.06.2019 10:20
What two things do you consider when evaluating the time value of money
Answers: 1
question
Business, 22.06.2019 12:00
In mexico, many garment or sewing shops found they could entice many young people to work for them if they offered clean, air conditioned work areas with high-quality locker rooms to clean up in after the work day. typically, traditional garment shops had to offer to get workers to apply for the hard, repetitive, and somewhat dangerous work. a. benchmark competitive wages b.compensating differentials c. monopoly wages d. wages based on human capital development of each employee
Answers: 3
You know the right answer?
I Need Help ASAP! Which of the following engineering drawing techniques shows the internal features...
Questions
question
Mathematics, 12.10.2020 23:01
question
Mathematics, 12.10.2020 23:01
question
Biology, 12.10.2020 23:01
question
Mathematics, 12.10.2020 23:01
Questions on the website: 13722363