subject
Business, 18.11.2020 07:20 chippedwood24

The overall project risk factor is known to be 0.5. The probability of dependency failure is twice the probability of complexity failure and four times the probability of maturity failure. The consequence of performance failure is twice the consequence of reliability failure, four times the consequence of schedule failure and eight times the consequence of cost failure. What is the difference between the probability of maturity failure and the consequence of cost failure? A) 0.026 B) 0.033 C) 0.041 D) 0.048

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 17:10
Acompany manufactures hair dryers. it buys some of the components, but it makes the heating element, which it can produce at the rate of 920 per day. hair dryers are assembled daily, 250 days a year, at a rate of 360 per day. because of the disparity between the production and usage rates, the heating elements are periodically produced in batches of 2,300 units. a. approximately how many batches of heating elements are produced annually? b. if production on a batch begins when there is no inventory of heating elements on hand, how much inventory will be on hand 4 days later? c. what is the average inventory of elements, assuming each production cycle begins when there are none on hand?
Answers: 1
question
Business, 22.06.2019 11:30
17.     chef a says that garnish should be added to a soup right before serving. chef b says that garnish should be cooked with the other ingredients in a soup. which chef is correct? a. chef a is correct. b. both chefs are correct. c. chef b is correct. d. neither chef is correct. student c   incorrect which is correct answer?
Answers: 2
question
Business, 22.06.2019 18:10
During the year, the delph company had no beginning or ending inventories and it started, completed, and sold only two jobs—job d-75 and job c-100. it provided the following information related to those two jobs: job d-75: molding fabrication total direct materials cost $ 375,000 $ 325,000 $ 700,000 direct labor cost $ 200,000 $ 160,000 $ 360,000 machine-hours 15,000 5,000 20,000 job c-100: molding fabrication total direct materials cost $ 300,000 $ 250,000 $ 550,000 direct labor cost $ 175,000 $ 225,000 $ 400,000 machine-hours 5,000 25,000 30,000delph had no overapplied or underapplied manufacturing overhead during the year. assume delph uses a plantwide overhead rate based on machine-hours.1-a. compute the predetermined plantwide overhead rate.1-b. compute the total manufacturing costs assigned to job d-70 and job c-200.1-c. if delph establishes bid prices that are 150% of total manufacturing costs, what bid price would it have established for job d-70 and job c-200? 1-d. what is delph's cost of goods sold for the year? assume delph uses departmental overhead rates based on machine-hours.2-a. compute the predetermined departmental overhead rates.2-b. compute the total manufacturing costs assigned to job d-70 and job c-200.2-c. if delph establishes bid prices that are 150% of total manufacturing costs, what bid price would it have established for job d-70 and job c-200? 2-d. what is delph's cost of goods sold for the year?
Answers: 3
question
Business, 22.06.2019 19:30
The usa today reports that the average expenditure on valentine's day is $100.89. do male and female consumers differ in the amounts they spend? the average expenditure in a sample survey of 47 male consumers was $135.67, and the average expenditure in a sample survey of 38 female consumers was $68.64. based on past surveys, the standard deviation for male consumers is assumed to be $34, and the standard deviation for female consumers is assumed to be $17.
Answers: 1
You know the right answer?
The overall project risk factor is known to be 0.5. The probability of dependency failure is twice t...
Questions
question
Mathematics, 18.03.2021 01:10
question
Engineering, 18.03.2021 01:10
Questions on the website: 13722363