subject
Business, 31.12.2020 18:40 ledtje03

Latiker, Inc., manufactures and sells two products: Product Y9 and Product W0. Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below: Expected Production Direct Labor-Hours Per Unit Total Direct Labor-Hours
Product Y9 100 8 800
Product W0 100 10 1,000
Total direct labor-hours 1,800

The direct labor rate is $15.40 per DLH. The direct materials cost per unit for each product is given below:

Direct Materials Cost per Unit
Product Y9 $253.00
Product W0 $278.80

The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity:

Activity Cost Pools Activity Measures Overhead Cost Product Y9 Product W0 Total
Labor-related DLHs $61,488 800 1,000 1,800
Machine setups setups 50,687 400 300 700
Order size MHs 155,754 5,000 5,200 10,200
$267,929

The activity rate for the Machine Setups activity cost pool under activity-based costing is closest to:

a. $31.15 per setup
b. $26.27 per setup
c. $29.95 per setup
d. $72.41 per setup

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 16:40
Determine the hrm’s role in the performance management process and explain how to ensure the process aligns with the organization’s strategic plan.
Answers: 1
question
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
question
Business, 23.06.2019 00:30
Dr. hughes enjoys offering to employees who perform over and above the call of duty
Answers: 1
question
Business, 23.06.2019 01:10
Mountain mouse makes freeze-dried meals for hikers. one of mountain mouse's biggest customers is a sporting goods superstore. every 66 days, mountain mouse checks the inventory level at the superstore and places an order to restock the meals. these meals are delivered by ups in 55 days. average demand during the reorder period and order lead time is 8585 meals, and the standard deviation of demand during this same time period is about 1919 meals.calculate the restocking level for mountain mouse. assume that the superstore wants a 95\% service level. what happens to the restocking level if the superstore wants a higher level of service-say, 99]%? the restocking level for the 95% service level is 117 mealssuppose there are 25 meals in the superstore when mountain mouse checks inventory levels. how many meals should be ordered, assuming a 95% service level?
Answers: 3
You know the right answer?
Latiker, Inc., manufactures and sells two products: Product Y9 and Product W0. Data concerning the e...
Questions
question
Business, 05.11.2020 04:00
question
Chemistry, 05.11.2020 04:00
question
Chemistry, 05.11.2020 04:00
Questions on the website: 13722367