subject
Business, 02.04.2021 18:20 staz13wiggins

Danube, Toggle, and ConnectOn rely on various intangible assets to operate their businesses. These companies amortize the cost of these assets using the straight-line method over the following average estimated useful lives (in years), as reported in their 2015 annual reports. Type of Intangible Asset Danube Toggle ConnectOn
Developed Technology 5.0 8.0 2.5
Trade Names 2.3 4.6 1.2
Customer Relationships 2.1 6.2 3.1

Assume each company spent $840,000 at the beginning of the current year for additional Developed Technology. Because of its proprietary nature, the technology is estimated to have no residual value at the end of its estimated life.

Required:
Calculate the impact (direction and amount) that the amortization of such expenditures would have on each companyâs Income from Operations in the current year.

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:40
Tandard product costs deerfield company manufactures product m in its factory. production of m requires 2 pounds of material p, costing $4 per pound and 0.5 hour of direct labor costing, $10 per hour. the variable overhead rate is $8 per direct labor hour, and the fixed overhead rate is $12 per direct labor hour. what is the standard product cost for product m? direct material answer direct labor answer variable overhead answer fixed overhead answer standard product cost per unit answer
Answers: 1
question
Business, 22.06.2019 12:00
Identify at least 3 body language messages that project a positive attitude
Answers: 2
question
Business, 22.06.2019 18:10
Consumers who participate in the sharing economy seem willing to interact with total strangers. despite safety and privacy concerns, what do you think is the long-term outlook for this change in the way we think about interacting with people whom we don't know? how can businesses to diminish worries some people may have about these practices?
Answers: 1
question
Business, 22.06.2019 23:00
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity.c. release work orders to the system at the bottleneck's capacity pace.d. increased bottleneck capacity is increased system capacity.e. bottlenecks should be moved to the end of the system process.
Answers: 1
You know the right answer?
Danube, Toggle, and ConnectOn rely on various intangible assets to operate their businesses. These c...
Questions
question
Chemistry, 18.03.2021 03:00
question
English, 18.03.2021 03:00
Questions on the website: 13722367