The following data relate to labor cost for production of 20,000 cellular telephones: Actual: 8,450 hrs. at $22.50 Standard: 8,400 hrs. at $23.00. A. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance.
B. The employees may have been less-experienced or poorly trained, thereby resulting in a labor rate than planned. The lower level of experience or training may have resulted in efficient performance. Thus, the actual time required was___than standard.

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 04:30
4. the condition requires that only one of the selected criteria be true for a record to be displayed.
Answers: 1
question
Business, 22.06.2019 12:50
You are working on a bid to build two city parks a year for the next three years. this project requires the purchase of $249,000 of equipment that will be depreciated using straight-line depreciation to a zero book value over the three-year project life. ignore bonus depreciation. the equipment can be sold at the end of the project for $115,000. you will also need $18.000 in net working capital for the duration of the project. the fixed costs will be $37000 a year and the variable costs will be $148,000 per park. your required rate of return is 14 percent and your tax rate is 21 percent. what is the minimal amount you should bid per park? (round your answer to the nearest $100) (a) $214,300 (b) $214,100 (c) $212,500 (d) $208,200 (e) $208,400
Answers: 3
question
Business, 22.06.2019 19:30
When it is 4: 00 a.m. in halifax, it is 1: 00 p.m. in karachi, and when it is 9: 00 a.m. in karachi, it is 5: 00 a.m. in warsaw. mary left halifax to fly to karachi, but she accidentally left her watch on warsaw time. according to mary’s watch, she left halifax at 9: 40 p.m. on monday. the local time when she arrived at karachi was 3: 00 p.m. tuesday. how long was mary’s flight? a. 9 hours, 20 minutes b. 13 hours, 20 minutes c. 14 hours, 20 minutes d. 17 hours, 20 minutes
Answers: 1
question
Business, 22.06.2019 19:50
Statistical process control charts: a. indicate to the operator the true quality of material leaving the process. b. display upper and lower limits for process variables or attributes and signal when a process is no longer in control. c. indicate to the process operator the average outgoing quality of each lot. d. display the measurements on every item being produced. e. are a graphic way of classifying problems by their level of importance, often referred to as the 80-20 rule.
Answers: 2
You know the right answer?
The following data relate to labor cost for production of 20,000 cellular telephones: Actual: 8,450...
Questions
question
Chemistry, 29.08.2020 14:01
question
Geography, 29.08.2020 14:01
Questions on the website: 13722363