is Company uses an ABC system. Which of the following statements​ is/are correct with respect to​ ABC? I. All cost allocation bases used in ABC systems are cost drivers. II. ABC systems are useful in​ manufacturing, but not in merchandising or service industries. III. ABC systems can eliminate cost distortions because ABC develops cost drivers that have a​ cause-and-effect relationship with the activities performed.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 13:00
Reliability and validity reliability and validity are two important considerations that must be made with any type of data collection. reliability refers to the ability to consistently produce a given result. in the context of psychological research, this would mean that any instruments or tools used to collect data do so in consistent, reproducible ways. unfortunately, being consistent in measurement does not necessarily mean that you have measured something correctly. to illustrate this concept, consider a kitchen scale that would be used to measure the weight of cereal that you eat in the morning. if the scale is not properly calibrated, it may consistently under- or overestimate the amount of cereal that’s being measured. while the scale is highly reliable in producing consistent results (e.g., the same amount of cereal poured onto the scale produces the same reading each time), those results are incorrect. this is where validity comes into play. validity refers to the extent to which a given instrument or tool accurately measures what it’s supposed to measure. while any valid measure is by necessity reliable, the reverse is not necessarily true. researchers strive to use instruments that are both highly reliable and valid.
Answers: 1
question
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
question
Business, 23.06.2019 04:50
Suppose an investor starts with a portfolio consisting of one randomly selected stock. as more and more randomly selected stocks are added to the portfolio, what happens to the portfolio's risk
Answers: 1
question
Business, 23.06.2019 10:00
In two or three sentences describe how open market operations change the money suppy
Answers: 3
You know the right answer?
is Company uses an ABC system. Which of the following statements​ is/are correct with respect to​ AB...
Questions
question
Computers and Technology, 31.07.2019 06:30
Questions on the website: 13722362