Answers: 2
Business, 22.06.2019 02:40
Aquatic marine stores company manufactures special metallic materials and decorative fittings for luxury yachts that require highly skilled labor. aquatic uses standard costs to prepare its flexible budget. for the first quarter of the year, direct materials and direct labor standards for one of their popular products were as follows: direct materials: 3 pounds per unit; $ 6 per pound direct labor: 4 hours per unit; $ 19 per hour during the first quarter, aquatic produced 5 comma 000 units of this product. actual direct materials and direct labor costs were $ 65 comma 000 and $ 330 comma 000, respectively. for the purpose of preparing the flexible budget, calculate the total standard direct materials cost at a production volume of 5 comma 000 units.
Answers: 2
Business, 23.06.2019 02:10
Make or buy eastside company incurs a total cost of $120,000 in producing 10,000 units of a component needed in the assembly of its major product. the component can be purchased from an outside supplier for $11 per unit. a related cost study indicates that the total cost of the component includes fixed costs equal to 50% of the variable costs involved. a. should eastside buy the component if it cannot otherwise use the released capacity? present your answer in the form of differential analysis. use negative sign represent a net disadvantage answer; otherwise do not use negative signs with your answers. cost from outside supplier $answer variable costs avoided by purchasing answer net advantage (disadvantage) to purchase alternative $answer b. what would be your answer to requirement (a) if the released capacity could be used in a project that would generate $50,000 of contribution margin? use negative sign represent a net disadvantage answer; otherwise do not use negative signs with your answers.
Answers: 2
Business, 23.06.2019 02:30
George retired from a local law firm and then volunteered to oversee a nonprofit's legal records. george is performing the duties of a:
Answers: 1
How might the FOMC determine to use the reserve requirement more (raise or lower)...
Mathematics, 16.04.2021 05:10
Health, 16.04.2021 05:10
Mathematics, 16.04.2021 05:10
Mathematics, 16.04.2021 05:10
Chemistry, 16.04.2021 05:10
History, 16.04.2021 05:10
English, 16.04.2021 05:10
History, 16.04.2021 05:10
Physics, 16.04.2021 05:10
English, 16.04.2021 05:10
English, 16.04.2021 05:10