Business, 06.07.2021 21:00 Jennifer2019
Error costs are costs associated with by the cost management system and measurement costs are the costs associated with making poor decisions.
Answers: 3
Business, 21.06.2019 21:10
Auniversity spent $1.8 million to install solar panels atop a parking garage. these panels will have a capacity of 400 kilowatts (kw) and have a life expectancy of 20 years. suppose that the discount rate is 20%, that electricity can be purchased at $0.10 per kilowatt-hour (kwh), and that the marginal cost of electricity production using the solar panels is zero. hint: it may be easier to think of the present value of operating the solar panels for 1 hour per year first. approximately how many hours per year will the solar panels need to operate to enable this project to break even? a. a.3,696.48 b.14,785.92 c.9,241.20 if the solar panels can operate only for 8,317 hours a year at maximum, the project (would/would not)break even?
Answers: 1
Business, 22.06.2019 09:00
You speak to a business owner that is taking in almost $2000 in revenue each month. the owner still says that they are having trouble keeping the doors open. how can that be possible? use the terms of revenue, expenses and profit/loss in your answer
Answers: 3
Business, 22.06.2019 10:00
University car wash built a deluxe car wash across the street from campus. the new machines cost $219,000 including installation. the company estimates that the equipment will have a residual value of $19,500. university car wash also estimates it will use the machine for six years or about 12,500 total hours. actual use per year was as follows: year hours used 1 3,100 2 1,100 3 1,200 4 2,800 5 2,600 6 1,200 prepare a depreciation schedule for six years using the following methods: 1. straight-line. 2. double-declining-balance. 3. activity-based.
Answers: 1
Business, 22.06.2019 13:30
The purpose of safety stock is to: a. eliminate the possibility of a stockout. b. control the likelihood of a stockout due to variable demand and/or lead time. c. eliminate the likelihood of a stockout due to erroneous inventory tally. d. protect the firm from a sudden decrease in demand. e. replace failed units with good ones.
Answers: 1
Error costs are costs associated with by the cost management system and measurement costs are the c...
English, 13.04.2020 00:12
Mathematics, 13.04.2020 00:12
History, 13.04.2020 00:12
Mathematics, 13.04.2020 00:12
Mathematics, 13.04.2020 00:13
Physics, 13.04.2020 00:13
History, 13.04.2020 00:13
Mathematics, 13.04.2020 00:13
Health, 13.04.2020 00:13