subject
Business, 04.08.2021 22:30 megaman104

A company is designing a product layout for a new product. It plans to use this production line to meet projected demand of 365 units per 7.50 hour day. The tasks necessary to produce this product are: Task Time (sec) Predecessor u 26 none v 31 u w 4 v x 13 u, v y 49 x z 26 v, y If the company wants the output rate to be equal to demand, what is the desired cycle time (in seconds)

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 19:40
Michigan mattress company is considering the purchase of land and the construction of a new plant. the land, which would be bought immediately (at t = 0), has a cost of $100,000 and the building, which would be erected at the end of the first year (t = 1), would cost $500,000. it is estimated that the firm's afterminustax cash flow will increase by $100,000 starting at the end of the second year, and that this incremental flow would increase at a 10 percent rate annually over the next 10 years. what is the approximate payback period?
Answers: 3
question
Business, 22.06.2019 09:30
The 39 percent and 38 percent tax rates both represent what is called a tax "bubble." suppose the government wanted to lower the upper threshold of the 39 percent marginal tax bracket from $335,000 to $208,000. what would the new 39 percent bubble rate have to be? (do not round intermediate calculations. enter your answer as a percent rounded to 2 decimal places,e.g., 32.16.)
Answers: 3
question
Business, 22.06.2019 21:00
Mr. beautiful, an organization that sells weight training sets, has an ordering cost of $40 for the bb-1 set. (bb-1 stands for body beautiful number 1.) the carrying cost for bb-1 is $5 per set per year. to meet demand, mr. beautiful orders large quantities of bb-1 seven times a year. the stockout cost for bb-1 is estimated to be $50 per set. over the past several years, mr. beautiful has observed the following demand during the lead time for bb-1: demand during lead time probability40 0.150 0.260 0.270 0.280 0.290 0.1total 1.0the reorder point for bb-1 is 60 sets. what level of safety stock should be maintained for bb-1?
Answers: 3
question
Business, 23.06.2019 00:40
Skathy lee berggren, a professor of oral communication at cornell university, indicates “a lot of my students re­ally [only] scratch the surface with the type of research they’re doing.” according to andy guess, at inside higher ed, “just because students walk in the door as ‘digital natives’, doesn’t mean they’re equipped to handle the heavy lifting of digital databases and proprietary search engines that comprise the bulk of modern, online re­search techniques.” students erroneously think a google search is research. as you read through the reasons that should stimulate your interest in studying research methods or evaluate the nine factors that guarantee good research, what actions do you propose to narrow the gap between students’ research competence and what’s required of a modern college graduate about to become a manage
Answers: 1
You know the right answer?
A company is designing a product layout for a new product. It plans to use this production line to m...
Questions
question
Mathematics, 07.07.2019 10:00
question
Physics, 07.07.2019 10:00
question
World Languages, 07.07.2019 10:00
Questions on the website: 13722359