subject
Business, 16.07.2019 06:50 denaw5779

Suppose 2-year treasury bonds yield 4.5%, while 1-year bonds yield 3%. r* is 1%, and the maturity risk premium is zero. using the expectations theory, what is the yield on a 1-year bond 1 year from now? calculate the yield using a geometric average.

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 19:10
The development price itself is such a huge barrier, it's just a very different business model than boeing's used to. our huge development programs are typically centered around commercial airplanes, military aircraft, where there is a lot of orders. and right now the foundation of the business is two bites a year.
Answers: 3
question
Business, 22.06.2019 06:30
"in my opinion, we ought to stop making our own drums and accept that outside supplier's offer," said wim niewindt, managing director of antilles refining, n.v., of aruba. "at a price of $21 per drum, we would be paying $4.70 less than it costs us to manufacture the drums in our own plant. since we use 70,000 drums a year, that would be an annual cost savings of $329,000." antilles refining's current cost to manufacture one drum is given below (based on 70,000 drums per year):
Answers: 1
question
Business, 22.06.2019 17:30
What is one counter argument to the premise that the wealth gap is a serious problem which needs to be addressed?
Answers: 1
question
Business, 23.06.2019 01:00
Jimmy's delicatessen sells large tins of tom tucker's toffee. the deli uses a periodic review system, checking inventory levels every 88 days, at which time an order is placed for more tins. order lead time is 22 days. daily demand is a constant 1515 tins, so average demand during the reorder period and order lead time (1010 days) is 150150 tins. draw a sawtooth diagram. assume that the beginning inventory level is equal to the restocking level and the desired service level is 99.9%. what is the safety stock level? (hint: look at the formula for calculating restocking level.) what is the average inventory level? the safety stock level is average inventory level is __chart: time (10,20,30), tins (0,150) lines touching both axisthe safety stock level is 0 tinsthe average inventory level is 75 tins
Answers: 2
You know the right answer?
Suppose 2-year treasury bonds yield 4.5%, while 1-year bonds yield 3%. r* is 1%, and the maturity ri...
Questions
question
Mathematics, 28.01.2021 19:30
question
Mathematics, 28.01.2021 19:30
question
Mathematics, 28.01.2021 19:30
Questions on the website: 13722362