Business, 27.07.2019 18:30 HeyItsCookie9605
If is constrained, we should the staffing level to lower capacity.
Answers: 1
Business, 21.06.2019 19:10
If we know that a firm has a net profit margin of 4.6 %, total asset turnover of 0.62, and a financial leverage multiplier of 1.54, what is its roe? what is the advantage to using the dupont system to calculate roe over the direct calculation of earnings available for common stockholders divided by common stock equity?
Answers: 2
Business, 21.06.2019 22:40
In allentown, pennsylvania, in the summer of 2014, the average price of a gallon of gasoline was $3.68long dasha 22-cent increase from the year before. many consumers were upset by the increase. one was quoted in a local newspaper as saying, "it's crazy. the government should step in." source: sam kennedy, "valley feeling pain at the pump," (allentown, pa) morning call, june 21, 2014. suppose the government had stepped in and imposed a price ceiling equal to old price of $3.46 per gallon. a. using the line drawing tool, draw and label the price ceiling. carefully follow the instructions above, and only draw the required object.
Answers: 3
Business, 22.06.2019 05:00
Xie company identified the following activities, costs, and activity drivers for 2017. the company manufactures two types of go-karts: deluxe and basic. activity expected costs expected activity handling materials $ 625,000 100,000 parts inspecting product 900,000 1,500 batches processing purchase orders 105,000 700 orders paying suppliers 175,000 500 invoices insuring the factory 300,000 40,000 square feet designing packaging 75,000 2 models required: 1. compute a single plantwide overhead rate, assuming that the company assigns overhead based on 125,000 budgeted direct labor hours. 2. in january 2017, the deluxe model required 2,500 direct labor hours and the basic model required 6,000 direct labor hours. assign overhead costs to each model using the single plantwide overhead rate.
Answers: 3
Business, 22.06.2019 14:30
Bridge building company estimates that it will incur $1,200,000 in overhead costs for the year. additionally, the company estimates 50,000 direct labor hours will be spent building custom walking bridges for the year at a total direct labor cost of $600,000. what is the predetermined overhead rate for bridge building company if direct labor costs are to be used as an allocation base?
Answers: 3
If is constrained, we should the staffing level to lower capacity....
Social Studies, 21.10.2020 17:01
Social Studies, 21.10.2020 17:01
History, 21.10.2020 17:01
Spanish, 21.10.2020 17:01
Spanish, 21.10.2020 17:01
Chemistry, 21.10.2020 17:01
English, 21.10.2020 17:01
Mathematics, 21.10.2020 17:01
Spanish, 21.10.2020 17:01
Mathematics, 21.10.2020 17:01
Mathematics, 21.10.2020 17:01
Mathematics, 21.10.2020 17:01
Physics, 21.10.2020 17:01
Mathematics, 21.10.2020 17:01
History, 21.10.2020 17:01
Mathematics, 21.10.2020 17:01