subject
Chemistry, 20.08.2019 23:20 heavendl13

Abatch dryer removes water from a solid at a rate of 30 kg/hr during the constant rate period. critical moisture content is 0.25 kg h okg dry solid. the equilibrium moisture content of the material is 0.035 kg hzokg dry solid. the drier is initially charged with 750 kg of total material, which contains 2 00 000 g of moisture. the final product should contain 0.08 kg h. olkg dry solid. the falling rate period can be represented by a straight line. the total drying area is 5 m2 2.1. draw a schematic diagram that depicts the process. 2.2. determine the total drying time to produce the product.

ansver
Answers: 1

Another question on Chemistry

question
Chemistry, 21.06.2019 20:40
Astudent made the lewis dot diagram of a compound shown. what is the error in the lewis dot diagram? a)an o atom should transfer all of its six electrons to mg because the formula is mgo b) both electrons of mg should be transferred to one o adam because the formula is mgo c) the electrons should be transferred from each o add him to capital mg because mg has fewer electrons d) the number of dots around mg should be four because it has to transfer two electrons to each o
Answers: 1
question
Chemistry, 22.06.2019 03:00
Atrain travels 74 kilometers in 3 hours, and then 81 kilometers in 5 hours. what is its average speed?
Answers: 2
question
Chemistry, 22.06.2019 09:30
In apex! a liquid heated beyond a certain temperature becomes
Answers: 1
question
Chemistry, 23.06.2019 00:50
The chemical formula for emerald is be3al2(sio3)6.an emerald can be decided as
Answers: 3
You know the right answer?
Abatch dryer removes water from a solid at a rate of 30 kg/hr during the constant rate period. criti...
Questions
question
Mathematics, 16.09.2021 04:50
question
Mathematics, 16.09.2021 04:50
question
Mathematics, 16.09.2021 05:00
Questions on the website: 13722367