The normal time for a work cycle in a worker-machine system is 6.27 min. for setting the standard time, the pfd allowance factor is 12%, and the machine allowance factor is 25%. the work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal elements. determine (a) the standard time for the cycle and (b) the daily output at standard performance. (c) during an 8-hour shift, the worker lost 39 min due to personal time, rest breaks, and delays, and she produced 72 pieces. what was the worker's pace on the operator-controlled portion of the shift?

ansver
Answers: 2

Another question on Chemistry

question
Chemistry, 22.06.2019 00:00
Acurium-245 nucleus is hit with a neutron and changes as shown by the equation. complete the equation by filling in the missing parts. 52
Answers: 2
question
Chemistry, 22.06.2019 09:40
Consider this initial-rate data at a certain temperature for the reaction described by
Answers: 1
question
Chemistry, 22.06.2019 13:30
Why does asexual reproduction result in offspring with identicle genetic variation
Answers: 2
question
Chemistry, 22.06.2019 15:30
Using the first volume and temperature reading on the table as v1 and t1, solve for the unknown values in the table below. remember to use the rules of significant figures when entering your numeric response.
Answers: 2
You know the right answer?
The normal time for a work cycle in a worker-machine system is 6.27 min. for setting the standard ti...
Questions
question
Mathematics, 27.09.2019 22:30
question
Mathematics, 27.09.2019 22:30
Questions on the website: 13722361