subject
Chemistry, 11.02.2020 02:26 cgonzalez0243

After two precast concrete elements are joined, the exposed metal connectors (e. g., bolts, nuts, shim plates, etc.) that are not covered by a slab topping are usually: Select one: a. epoxy grouted together. b. covered with a spray-on fireproofing material. c. cut with a diamond-blade saw. d. ignored; there is no need to treat the connectors once the precast pieces are joined. e. dry-packed with Portland cement grout.

ansver
Answers: 2

Another question on Chemistry

question
Chemistry, 21.06.2019 18:30
Strong conductivity of plasma allows it to act and react as and
Answers: 2
question
Chemistry, 21.06.2019 20:30
An exothermic reaction is conducted in an insulated calorimeter filled with water. the calorimeter is then sealed so that there is no heat exchanged between the contents of the container and the surrounding air. which of the following statements is true about the reaction?
Answers: 1
question
Chemistry, 22.06.2019 09:10
Which compound contain an iron with a 3+ charge
Answers: 1
question
Chemistry, 22.06.2019 09:40
Consider this initial-rate data at a certain temperature for the reaction described by
Answers: 1
You know the right answer?
After two precast concrete elements are joined, the exposed metal connectors (e. g., bolts, nuts, sh...
Questions
Questions on the website: 13722363