subject

The master production schedule for product a shows a need for 30 units, and product b shows a need of 25 units. to manufacture a unit of product a, three units of component c are required. to manufacture a unit of product b, four units of component c are required. determine the gross requirements for component c to complete production.

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 09:00
Designing a mobile web page is a little different from designing a regular web page. name at least three features that should be considered when designing a website that is mobile phone-friendly, and briefly explain why they are important.
Answers: 1
question
Computers and Technology, 22.06.2019 21:00
Kirk found a local community college with a two-year program and he is comparing the cost with that of an out-of-state two-year school. what is the expected total cost for one year at the local community college if kirk lives at home? what is the expected total cost for one year at the out-of-state school if kirk lives on campus?
Answers: 2
question
Computers and Technology, 23.06.2019 09:30
Given a link with a maximum transmission rate of 32.8 mbps. only two computers, x and y, wish to transmit starting at time t = 0 seconds. computer x sends filex (4 mib) and computer y sends filey (244 kib), both starting at time t = 0. statistical multiplexing is used, with details as follows packet payload size = 1000 bytes packet header size = 24 bytes (overhead) ignore processing and queueing delays assume partial packets (packets consisting of less than 1000 bytes of data) are padded so that they are the same size as full packets. assume continuous alternating-packet transmission. computer x gets the transmission medium first. at what time (t = ? ) would filey finish transmitting? give answer in milliseconds, without units, and round to one decimal places (e.g. for an answer of 0.013777 seconds you would enter "13.8" without the quotes)
Answers: 3
question
Computers and Technology, 23.06.2019 22:30
What would be the address of the cell, which is at the intersection of the second row and the third column in a worksheet?
Answers: 1
You know the right answer?
The master production schedule for product a shows a need for 30 units, and product b shows a need o...
Questions
Questions on the website: 13722367