subject

During the design of a product for a customer, your design team finds that an electrical component is
not working as planned. This design flaw will add three days to the specified completion date.
Which choice demonstrates following through on the commitment you made to the customer?
You do nothing. It is normal that projects are often extended beyond the deadline
You and your team create and submit a plan to your supervisor that will require overtime but solve the issue.
You inform your supervisor about the person on the team who made the design flaw and recommend having that person fix the
problem
You work hard to make up the lost time by finding a couple of minor steps to skip. You and your peers do not want to upset your
boss with this information

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 07:20
Write a pseudocode solution for each of these problems. 1. design a while loop that lets that user enter a number. the number should be multiplied by 10, and the result stored in a variable named product. the loop should iterate as long as product contains a value less than 100. 2. design a do-while loop that asks the user to enter two numbers. the numbers should be added and the sum displayed. the loop should ask the user whether he or she wishes to perform the operation again. if so, the loop should repeat; otherwise it should terminate. 3. design a for loop that displays the following set of numbers: 0, 10, 20, 30, 40, 50 100. 4. design a nested loop that displays 10 rows of # characters. there should be 15 # characters in each row. 5. convert this for loop to a while loop. declare integer count for count = 1 to 50 display count end for 6. find the error in the following pseudocode. declare boolean finished = false declare integer value, cube while not finished display “enter a value to be cubed.” input value; set cube = value ^ 3 display value, “ cubed is “, cube end while
Answers: 2
question
Computers and Technology, 22.06.2019 18:00
Which of the following physical laws can make the flow of water seem more realistic? a. motion b. gravity c. fluid dynamics d. thermodynamics
Answers: 2
question
Computers and Technology, 23.06.2019 02:00
Which of the following is not a source of sustainable raw materials? a) coal mine b) flick of sheep c) cotton plantation d) line forest.
Answers: 2
question
Computers and Technology, 23.06.2019 09:30
After you present a proposal, the committee starts asking you questions, some beyond the strict focus of your proposal. they ask questions about implications in other fields and knowledge about other fields. you are asked to redo your proposal. what is most likely missing? breadth of material depth of material clarity of material details of material
Answers: 1
You know the right answer?
During the design of a product for a customer, your design team finds that an electrical component i...
Questions
question
Mathematics, 28.05.2021 17:20
question
Social Studies, 28.05.2021 17:20
question
Mathematics, 28.05.2021 17:20
question
Mathematics, 28.05.2021 17:20
question
Mathematics, 28.05.2021 17:20
Questions on the website: 13722362