subject

Indica algunos errores que se suelen detectar durante la fase de evaluación del proyecto. Chicos se refiere a las etapas de un proyecto (diseño, comprobacion y eso)

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 21.06.2019 22:00
Determine which of the four levels of measurement (nominal, ordinal, interval, ratio) is most appropriate for the data below. internet speed levels of "fast comma " "medium comma " and "slow" choose the correct answer below. a. the ordinal level of measurement is most appropriate because the data can be ordered comma but differences left parenthesis obtained by subtraction right parenthesis cannot be found or are meaningless. nothing nothing nothing nothing nothing b. the interval level of measurement is most appropriate because the data can be ordered comma differences left parenthesis obtained by subtraction right parenthesis can be found and are meaningful comma and there is no natural starting point. c. the nominal level of measurement is most appropriate because the data cannot be ordered. nothing d. the ratio level of measurement is most appropriate because the data can be ordered comma differences left parenthesis obtained by subtraction right parenthesis can be found and are meaningful comma and there is a natural starting point.
Answers: 2
question
Computers and Technology, 22.06.2019 04:50
Which are steps taken to diagnose a computer problem? a) reproducing the problem and using error codes b) reproducing the problem and troubleshooting c) using error codes and troubleshooting d) using error codes and stepping functions
Answers: 1
question
Computers and Technology, 22.06.2019 10:50
Using least squares fitting, you are to fit the data sets to the following models and solve for the parameters ai , where i is the index of the parameter. the input/output data for the systems are linked in the bblearn site. for each of the systems use matlab to plot the supplied data vs. the model fit on one plot. include your code in the solutions. (a) linear fit "lineardata.mat" y=a1x^3 + a2x^2 + a3x + a4 (b) plant fit "plantdata.mat g(s) = a1/(s + a2)
Answers: 1
question
Computers and Technology, 23.06.2019 10:00
What is estimated time of arrival (eta)? a device that measures the acceleration (the rate of change of velocity) of an item and is used to track truck speeds or taxi cab speeds a gps technology adventure game that posts the longitude and latitude location for an item on the internet for users to find a north/south measurement of position the time of day of an expected arrival at a certain destination and is typically used for navigation applications
Answers: 3
You know the right answer?
Indica algunos errores que se suelen detectar durante la fase de evaluación del proyecto. Chicos se...
Questions
question
English, 15.04.2020 19:08
Questions on the website: 13722360