subject

When a project is completed and turned over to its stakeholders, it is considered

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 21.06.2019 16:20
Quincy would like to view the contents of a specific message in his inbox. a portion of his computer screen is shown. what should quincy do in order to complete this task? 1. click on the inbox in the navigation pane, and click on the specific message in the folder pane to display its contents. 2. click on the inbox in the outlook today window, and click on the specific message in the folder pane to display its contents. 3. double-click the message’s header in the outlook today window, and right-click on the specific message to display its contents. 4. double-click the mail option in the navigation pane, and right-click on the specific message to display its contents.
Answers: 1
question
Computers and Technology, 21.06.2019 22:00
Which one of the following would administrators use to connect to a remote server securely for administration? a. telnetb. secure file transfer protocol (sftp)c. secure copy (scp)d. secure shell (ssh)
Answers: 1
question
Computers and Technology, 22.06.2019 08:10
Technician a says that if a valve is open when a piston rises to the very top of a cylinder, the piston may actually strike the valve head and cause serious engine damage. technician b says if the camshaft is located in the engine block, then the engine is called an overhead valve engine, ohv engine, or an in-block camshaft. who is right? a. b only b. both a and b c. a only d. neither a nor b
Answers: 3
question
Computers and Technology, 23.06.2019 01:30
In deadlock avoidance using banker’s algorithm, what would be the consequence(s) of: (i) a process declaring its maximum need as maximum possible for each resource. in other words, if a resource a has 5 instances, then each process declares its maximum need as 5. (ii) a process declaring its minimum needs as maximum needs. for example, a process may need 2-5 instances of resource a. but it declares its maximum need as 2.
Answers: 3
You know the right answer?
When a project is completed and turned over to its stakeholders, it is considered...
Questions
question
Mathematics, 18.03.2021 03:20
question
Mathematics, 18.03.2021 03:20
question
Physics, 18.03.2021 03:20
Questions on the website: 13722360