subject

A Layer 3 switch has been configured to route IP packets between VLANs 1, 2, and 3 using SVIs, which connect to subnets 172.20.1.0/25, 172.20.2.0/25, and 172.20.3.0/25, respectively. The engineer issues a show ip route connected command on the Layer 3 switch, listing the connected routes. Which of the following answers lists a piece of information that should be in at least one of the routes? a. Interface Gigabit Ethernet 0/0.3
b. Next-hop router 172.20.2.1
c. Interface VLAN 2
d. Mask 255.255.255.0

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 21.06.2019 16:30
Margins can be modified in the page layout tab or by using
Answers: 2
question
Computers and Technology, 22.06.2019 06:30
Requirement types discussed during software development include functional and color scheme nonfunctional and code style constraint and nonfunctional fashionable and functional.
Answers: 2
question
Computers and Technology, 23.06.2019 18:00
Apunishment or the threat of punishment used to enforce conformity. select the best answer from the choices provided t f
Answers: 1
question
Computers and Technology, 23.06.2019 18:30
Report all segments of identity by descent longer than 20 polymorphisms between pairs of individuals in the following cohort of 15 individuals across 49 polymorphisms: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 numeric input 2 points possible (graded) you have 2 attempts to complete the assignment below. for example if the sequence is "bcd", which occurs in "abcdef" , the starting point would be 2 (b), and the finishing point would be 4(d). individuals 7,10 between positions
Answers: 1
You know the right answer?
A Layer 3 switch has been configured to route IP packets between VLANs 1, 2, and 3 using SVIs, which...
Questions
question
English, 27.01.2021 17:10
question
Mathematics, 27.01.2021 17:10
question
Physics, 27.01.2021 17:10
question
Business, 27.01.2021 17:10
Questions on the website: 13722360