Acardboard box supplier must deliver 3,000 size large boxes per week to keep its largest customer happy. the process for manufacturing the box is a four-step serial process and because they use recycled material, material quality is sometimes compromised resulting in scrap at each step. the scrap (defect) rates for the four respective steps are as follows: d1=0.07, d2=0.04, d3=0.05, and d4=0.02. how many boxes need to be started each month to meet the desired demand.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:20
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
You know the right answer?
Acardboard box supplier must deliver 3,000 size large boxes per week to keep its largest customer ha...
Questions
question
Mathematics, 28.01.2020 03:31
question
History, 28.01.2020 03:31
Questions on the website: 13722362