subject
Engineering, 11.07.2019 03:20 oliviavaughan01

Apump supplies oil at 25 gpm to a 3-in diameter double acting hydraulic cylinder. if the load is 2000 lb (extending and retracting) and the rod diameter is 3 in, find: a) the hydraulic pressure during the extending stroke. b) the piston velocity during the extending stroke c) the cylinder horsepower during the extending stroke. d) the hydraulic pressure during the retraction stroke. e) the piston velocity during the retraction stroke f) the cylinder horsepower during the retraction stroke.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Apump supplies oil at 25 gpm to a 3-in diameter double acting hydraulic cylinder. if the load is 200...
Questions
question
Mathematics, 12.06.2021 19:30
question
Chemistry, 12.06.2021 19:30
question
Mathematics, 12.06.2021 19:30
question
Chemistry, 12.06.2021 19:30
question
Health, 12.06.2021 19:30
question
Health, 12.06.2021 19:30
Questions on the website: 13722363