subject
Engineering, 18.07.2019 22:30 gracie18383

The cost of product validation is $ 1600 per test sample (includes the cost to produce, test, monitor and analyse the unit). how much extra cost will be incurred if the reliability demonstration requirement changes from r = 95.0% to 97.0% at the same 90% confidence level?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 19:20
The process in which the system pressure remain constant is called a)-isobaric b)-isochoric c)-isolated d)-isothermal
Answers: 3
question
Engineering, 04.07.2019 19:20
Amass-spring-viscous damper system of mass 3 kg has a frequency of 100 rad/s and is critically damped. its initial conditions are x(0)-3 mm and (0)-2.3 m/s. does the system overshoot its equilibrium position? prove your answer
Answers: 1
question
Engineering, 04.07.2019 19:20
Asimple speed reducer is composed of 2 spur gears. the pinion gear has a pitch diameter of 0.75" and 36 teeth while the driven gear has a pitch diameter of 4.0" and 192 teeth. a)-what is the diametral pitch of each gear? b)-if an electric motor rotating ccw at 3000 rpm is coupled to the pinion, what is the rotational speed of the driven gear? c)-if the torque delivered to the pinion is 1 n-m, what is the torque on the driven gear? d)-what is the power transmitted by the gear train?
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
The cost of product validation is $ 1600 per test sample (includes the cost to produce, test, monito...
Questions
question
Mathematics, 16.07.2019 18:00
question
Health, 16.07.2019 18:00
Questions on the website: 13722361