subject
Engineering, 19.07.2019 21:20 wellllm

Atank contains 3l of water and is held at a constant pressure by regulated air pressure. the tank has a nozzle at the bottom with a diameter of 5mm that discharges to the atmosphere. if the tank is to be drained of water in 10 seconds, what is the minimum gage air pressure that must be provided? the tank is cylindrical and the diameter is the same as the length. a. 56 kpa b. 117 kpa c. 79 kpa d. 154 kpa

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Atank contains 3l of water and is held at a constant pressure by regulated air pressure. the tank ha...
Questions
question
Mathematics, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
question
Computers and Technology, 02.12.2020 03:00
Questions on the website: 13722363