subject
Engineering, 26.07.2019 17:10 jrff3262

Acertain manufacturer has signed a contract to ship 500,000 units of its product to her customer within one year. the manufacturer runs a two ten-hour shifts and each shift includes a 30-minutes lunch break and two ten-minutes breaks. the plant works five days a week and have nine holidays per year. calculate the takt time.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
You know the right answer?
Acertain manufacturer has signed a contract to ship 500,000 units of its product to her customer wit...
Questions
question
Mathematics, 18.12.2020 06:50
question
Mathematics, 18.12.2020 06:50
Questions on the website: 13722359