Macrohard have conducted a multiple linear regression analysis to predict the loading time (y) in milliseconds (thousandths of seconds) for macrohard workstation files based on the size of the file (x1) in kilobytes and the speed of the processor used to view the file (x2) in megahertz. the analysis was based on a random sample of 400 macrohard workstation users. the file sizes in the sample ranged from 110 to 5,000 kilobytes and the speed of the processors in the sample ranged from 500 megahertz to 4,000 megahertz. the multiple linear regression equation corresponding to macrohard's analysis is: y^i = 246.10 + 0.36x1i - 0.043x2iaccording to macrohard's multiple regression equation, it is most reasonable to conclude that: a. holding x1 constant, a one megahertz increase in x2 will result in an increase of 0.36 in the predicted value of yb. a 5,600 kilobyte file is predicted to take 2,004.1 milliseconds to load on a 6,000 megahertz processorc. a 75 kilobyte file is predicted to take 257.2 milliseconds to load on a 370 megahertz processord. holding x1 constant, a one megahertz increase in x2 will result in a decrease of 0.043 in the predicted value of y

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
Macrohard have conducted a multiple linear regression analysis to predict the loading time (y) in mi...
Questions
question
Mathematics, 25.09.2019 04:50
Questions on the website: 13722360