subject
Engineering, 06.08.2019 23:30 adayisenga

Acarnot vapor refrigeration cycle operates between thermal reservoirs at 4°c and 30°c. the working fluid is saturated vapor at the end of the compression process and saturated liquid at the beginning of the expansion process. determine the operating pressures in the condenser and evaporator, in bar, and the coefficient of performance for each of the following as the working fluid. (a) refrigerant 134a (b) refrigerant r22 (c) water (d) ammonia

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Acarnot vapor refrigeration cycle operates between thermal reservoirs at 4°c and 30°c. the working f...
Questions
question
Mathematics, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
English, 17.09.2020 14:01
question
History, 17.09.2020 14:01
question
Social Studies, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
History, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
Biology, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
question
English, 17.09.2020 14:01
question
Mathematics, 17.09.2020 14:01
Questions on the website: 13722361