subject
Engineering, 30.08.2019 17:20 lekaje2375

Amanual assembly line is being planned for a product whose annual demand = 9 units. a continuously moving conveyor will be used with work units attached. work content time = 55 min. the line will run 50 wk/yr, 5 shifts/wk, and 8 hr/shift. each worker will be assigned to a separate workstation. based on previous experience, assume line efficiency = 0.95, balancing efficiency = 0.93, and repositioning time = 9 sec. determine: a. hourly production rate to meet the demand, b. number of workers and work station required, and c. for comparison, the ideal minimum number of workstations required (theoretical).

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
You know the right answer?
Amanual assembly line is being planned for a product whose annual demand = 9 units. a continuously m...
Questions
question
Mathematics, 03.03.2020 23:54
Questions on the website: 13722359