Engineering, 13.09.2019 01:30 shamiya15
It is necessary to lay out and mark a point d exactly 300.00 ft distant from point c for a construction project. a steel tape with an actual length of 100.03 ft is used. what should be the distance measured from c to accurately set the mark for point d? (assume a standard 20 lb tension is used, and temperature of 68of)
Answers: 1
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
It is necessary to lay out and mark a point d exactly 300.00 ft distant from point c for a construct...
Mathematics, 06.05.2021 17:00
Biology, 06.05.2021 17:00
Mathematics, 06.05.2021 17:00
Mathematics, 06.05.2021 17:00
Mathematics, 06.05.2021 17:00
English, 06.05.2021 17:00
Mathematics, 06.05.2021 17:00
Advanced Placement (AP), 06.05.2021 17:00
Mathematics, 06.05.2021 17:00