Air is compressed in a piston-cylinder assembly from p1=
10lbf/in.2, t1 = 500or to afinal
volume of v2 = 1 ft3 in a processdescribed by
pv1.25 = constant. the mass of air is0.5lb. assuming
ideal gas behavior and neglecting kinetic andpotential energy
effects, determing the work and the heat transfer, each in btu,
using constant specific heats evaluated at500or and
ideal gas properties.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Air is compressed in a piston-cylinder assembly from p1=
10lbf/in.2, t1 = 500or to afinal
Questions
question
Mathematics, 05.09.2020 23:01
question
Mathematics, 05.09.2020 23:01
Questions on the website: 13722367