Engineering, 25.09.2019 05:00 josephvcarter
A7-station transfer line has been observed over a 40-hour period. the process times at each station are as follows: station 1, 0.80 min; station 2, 1.10 min; station 3, 1.15 min; station 4, 0.95 min; station 5, 1.06 min; station 6, 0.92 min; and station 7, 0.80 min. the transfer time between stations = 6 sec. the number of downtime occurrences = 110, and hours of downtime = 14.5 hours. a proposal has been submitted to locate a storage buffer (capacity = 20) between stations 4 and 5 to improve line efficiency. using the upper-bound approach, compute the line efficiency and production rate of the new buffer installed transfer line.
Answers: 1
Engineering, 03.07.2019 14:10
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
A7-station transfer line has been observed over a 40-hour period. the process times at each station...
Computers and Technology, 15.03.2020 19:33
Mathematics, 15.03.2020 19:34
Mathematics, 15.03.2020 19:38
Mathematics, 15.03.2020 19:48
Chemistry, 15.03.2020 19:48
Health, 15.03.2020 19:48
Social Studies, 15.03.2020 19:49
Chemistry, 15.03.2020 19:49
Chemistry, 15.03.2020 19:49
English, 15.03.2020 19:49
Mathematics, 15.03.2020 19:49
Mathematics, 15.03.2020 19:50
Mathematics, 15.03.2020 19:50